• H.H. Barnum Company | Controls for Factory Automation

Long Lead Times For Servo Cable Assemblies?

Long Lead Times For Servo Cable Assemblies?

Long Lead Times For Servo Cable Assemblies? 922 1016 H.H. Barnum


See how Barnum and Lutze can help reduce cost and lead times for Servomotor and Feedback Cables

LUTZE Inc has a long standing reputation as a manufacturer of factory automation cables such as LUTZE Superflex® Plus. This high performance flexing cable with Polyurethane jacket is available pre-assembled and designed to work with existing servo drive systems such as Bosch Rexroth®, Allen-Bradley® Standard 2090 and Siemens® 6FX .

Furthermore, LUTZE offers a new single cable solution where power and feedback is included in the same cable. This cable design is compatible with any system using the HIPERFACE DSL Interface and has been tested by the original interface system supplier. LUTZE’s cable design provides outstanding mechanical and electrical performance in continuous motion applications and is optimally suited for use with various servo systems. LUTZE cable assemblies offer low cable capacitance values and small cable ODs. These features lead to better performance and increased up time.

The LÜTZE prefabricated cables for Rockwell® Automation systems are compatible to the Allen-Bradley® standard 2090. The prefabricated LÜTZE servomotor and feedback cables are ideally suited for industrial environments for use in drives, motors and encoders from Rockwell® Allen-Bradley®. The LÜTZE cables are specially designed for use in C-tracks and meet the highest of standards. As part of our service, LÜTZE supplies customised lengths in 0.5 m steps for orders of just 1 assembly.

Weinstadt-based automation specialist LÜTZE has added over 200 new connector types to its SIEMENS 6FX servo harnessing range and now also offers harnesses with connector size 3 (M58). All harnesses are fabricated either as base or extension cables for SIEMENS servo drives with cable cross-sections up to 50 mm². As a result, LÜTZE is able to offer the full SIEMENS standard range from the smallest to the largest connector size. LÜTZE holds stocks of the corresponding termination equipment specially for SIEMENS SIMODRIVE and SINAMICS systems. LÜTZE can rapidly produce custom modifications, including interim lengths.

*Bosch Rexroth®, Allen-Bradley® Standard 2090 and Siemens® 6FX . are  registered trademarks and have no affiliations with LUTZE.

  • Include any helpful or supporting files.
    Drop files here or
    Accepted file types: jpg, png, gif, pdf, zip, doc, xls, ppt, Max. file size: 50 MB, Max. files: 4.
    • Please solve the math problem to let us know you're not a spam bot.